Project Information
Major Projects Executed by BPCH
Implemented Hydro-projects
- Detailed design, engineering, construction supervision and testing and commissioning of Khudi
Hydroelectric Project (4 MW), Lamjung 2006
- Feasibility study, detailed design, engineering, EIA and construction supervision of Khimti I
Hydroelectric Project (60 MW), Central Nepal, 2000
- Feasibility study, detailed design, engineering and construction supervision of Jhimruk Hydroelectric
and Rural Electric Project (12 MW), Western Nepal, 1997
- Detailed design, engineering and construction supervision of Andhikhola Hydro electric and Rural
Electreification Project (5.1 MW), Western Nepal, 1991
Feasibility, Environmenal Studies and Detail Design of Hydro-projects
- Feasibility study and EIA of 14.7 MW Khare Khola Hydropwer Projects for IRG / DoED, September 2006
- Final Design and tender documents preparation for Melamchi Diversion Scheme for Norplan AS, Dec 2002
- Environmental Review and Auditing of the Khimti I Hydroelectric Project for HPL, 2001
- Development and implemention of a technical master plan for enterprises and electrification within
the JREDP area for HPL, 2000
- Environment Mitigation and Monitoring Program on Khimti I Hydroelectric Project for HPL, Dec 1999
- Bankable Feasibility study of Melamchi Diversion Scheme for National Water Supply Corporation, July 1996
Others
- Inspection, Maintenance and monitoring work of Tsho Rolpa Glof Risk Reduction Project for DHM, Dec 2002
- Evaluation of Tsho Rolpa, an unstable glacial lake and prepared a design – build contract to lower the lake
level 3m for DHM and Neda, Oct 2000
- Engineering Design, Project Management, Construction Supervision and Community support works of Tsho Rolpa
Glof Early Warning System Installation for BC Hydro, Canada, 1997
- Feasibility study for development of a solid waste landfill site in the Simpani valley, 1997
- Design and Project Management for construction of 22 km Nayapul Kirne Road Project for DoED, Dec 1996
Recent Achievements
- Preparation and Submission of International Bid for developing 30 MW Kabeli-A Hydropower Project (on BOOT basis) to DoED,
Contract and negotiation meeting ongoing
- Sustainable Rural Electrification at Syangia, Palpa, Arghakhanchi and Lalitpur Districts under Rural
Electrification Global Development Alliance Nepal (REGDAN) funded by USAID, Kathmandu, Feb 2008
- Pre-qualified on Consultancy Services for Feasibility Studies of Hydel Power Staitons in Punjab, Pakistan
funded by ADB after submission of Expression of Interest as a joint venture of BPC and BPR Energy, Canada with
BPC as Lead Partner, January 2008
- Concept study of 250 MW Tamakoshi 2 (T2) and Tamakoshi 3 (T3) hydropower projects with Norconsult for SN Power,
Norway, 2007
- Feasibility study of 50 MW Balefi Project
Current Project Under Execution
| Name of Project and Short Description |
Client/Donor |
Place of Work |
Duration |
| REEP (Rural Electrification Expansion Project) & JDMP (Jhimruk Downstream
Mitigation Project) |
Norwegian Embassy, Kathmandu |
Pyuthan and Syangja district Nepal |
2007-2011 |
| Detailed Engineering Design and Construction Supervision of Nyadi Hydropower
Project (20 MW) |
Nyadi Hydropower Company Ltd. |
Lamjung, Western Nepal |
2007-2010 |
| Khimti Fish Monitoring project to study the impact of the khimti I hydropower
project (60MW) on the fish population |
SWECO GRONER, Norway and Himal Power Limited, Nepal |
Central Nepal |
2007-2008 |
| Feasibility Study Revision and Detailed Design of Upper Mai Hydroelectric Project |
East Nepal Development Endeavor Pvt. Ltd |
Ilam |
2007-2008 |
| Feasibility Study and EIA of Madi Khola Small Hydropower Project |
Department of Electricity Development |
Eastern and Western Nepal |
2006-2008 |
| Feasibility study and EIA of Bhim Khola Small Hydropower Project (3.1 MW) |
BPC |
Western Nepal |
2005-2008 |
| Feasibility Study and EIA of Lower Hongu Hydropower Project (9.7 MW) |
Department of Electricity Development |
Eastern Nepal |
2005-2008 |
|