|
Andhikhola Hydropower Plant
Andhikhola Hydroelectric and Rural Electrification Centre
Andhikhola Hydroelectric and Rural Electrification Centre (AHREC), located in Syangja District, has an
installed capacity of 5.1 MW. The construction of the plant started in 1982 and commercial operation started from 1991.
Salient Features of Andhikhola Power Plant
| Type of Power Plant |
: Run of the river with daily pondage |
| Capacity |
: 5.1 MW |
| Net Head |
: 238 m |
| Discharge |
: 2.70 m3/sec |
| Annual Energy Production |
: 45 GWh |
|